| PATTERN OF CENTRAL FINANCIAL ASSISTANCE (CFA) FOR
2005-06 REMOTE VILLAGE ELECTRIFICATION PROGRAMME
1. Electrification through SPV Systems
Model I and Model II of solar systems as specified
hereunder would only be eligible for support. For
proposal involving other models, Central Financial
Assistance (CFA) would be calculated on the basis of
actual prices or a maximum of those given below
whichever is lower.
Amount in Rupees
|
SPV System |
|
General category States |
Special Category State |
|
Solar Home System Model I
|
18 W Module , 1 light |
Rs.6050 |
Rs.6124 |
|
Solar Home System Model 2
|
37 W Module, 2 lights |
Rs.9950 |
Rs.10700 |
|
Solar Street lighting System
|
|
Rs.19800 |
Rs.21090 |
|
Power Plants with Distribution Lines with 10
years CMC |
2.5 kWp |
Rs.812500 |
Rs.962424 |
|
5 kWp |
Rs.1432480 |
Rs.1554252 |
|
10 kWp |
Rs.3123800 |
Rs.3458376 |
|
25 kWp |
Rs.7135000 |
Rs.7721000 |
The CFA is based on the cost which includes supply of
the system at the site installation, commissioning and
Comprehensive Maintenance Contract (CMC) for five years
for home lighting systems including replacement
guarantee for parts and components such as battery,
electronic, lamps, etc. For Pv modules, the replacement
guarantee is for ten years.
II. Electrification through Small Projects.
|
Region |
Upto 100 KW |
Above 100 KW & upto 999 KW |
|
For N.E. Region Sikkim , J & K.H. P. and
Uttaranchal |
CFA & 90% of the project cost. The CFA to
be calculated at actual cost or a maximum of the
amounts given below, whichever is lower. |
|
|
Rs. 60,000/- KW |
Rs. 60 lakhs + Rs. 43250/KW |
|
Notified hilly regions of other States &
Island |
CFA & 90% of the Project cost. The CFA to
be calculated at actual cost or a maximum of the
amounts given below whichever is lower. |
|
|
Rs. 60,000/- KW |
Rs. 60 lakhs + Rs. 43250/KW |
|
Plain & other regions of all other States |
CFA & 90% of the Project cost. The CFA to
be calculated at actual cost or a maximum of the
amounts given below whichever is lower. |
|
| |
Rs. 45,000/- KW |
Rs. 45 lakhs + Rs. 29250/KW |
III. Electrification through Biomass Gasifier
Projects.
CFA in the form of capital subsidy on pro-rate basis
to the extent 90% of the cost of Rs. 15 lakhs for a
basis packages for a 5KW project covering biomass
gasifier system, housing and local distribution with the
balance to be met by State Agency, Panchayat,
beneficiaries, etc. A average size of 50KW has been
considered with unit size of 25KW capacity, modular upto
100 KW, and a special rating of 10KW. For cluster of
villages, projects upto 1MW can be considered.
Additional Rs. 1.50 lakh per 50KW plant to be
provided for regular availability of biomass, including
collection, processing and storage and operation and
maintenance, including AMC for 5 years after the
warrantee period. In addition, for internal wiring,
beneficiary will be provided micro-credit facility for
three points @ Rs. 1500/- per household.
One-time funding of upto Rs. 5.0 lakhs Rs. 5.0 lakhs
to be provided to gasifier manufacturers/suppliers for
establishing service centers in area where cluster of
systems, minimum 10, are set up.
|